Time for another update as things are happening
First up is the fuel system, we took the hoses in the channel under the drivers door.
Strapped into the front wheel area.
Here you can see it go down in to the darkness in the channel. We took some gum around them in the entrance to avoid rubbing in the steel that will result in a fuel-leak.
The brackets to the doors being sanded and painted before install.
The doors installed as a test, they fitted very nice. We just have to install the locks in the rear of the doors and they`re ready.
We`ve also installed the switches in the dashboard, came out really well.
And the finished result with indicators and everything.
More in the rear, the battery will soon be installed.
Some of the whole car as it is now.
Right now we are waiting for some bearings to the rods before we can install the engine. Almost everything around it, as fuel system, electronics, dry sump are ready, so hopefully she will be running soon
Stiansen-
Full Carbon Supra
GT47-80, AEM, CP Pistons++
www.twinsturbo.com www.tevodekk.no www.japantuning.no